cip | 33 |
---|---|
title | Lotus Network Upgrade |
description | Reference specifications included in the Lotus Network Upgrade |
author | @evan-forbes |
discussions-to | https://forum.celestia.org/t/lotus-application-v4-network-upgrade/1947 |
status | Final |
type | Meta |
created | 2025-03-16 |
requires | CIP-29, CIP-30, CIP-31, CIP-32 |
Abstract
This Meta CIP lists the CIPs included in the Lotus network upgrade.
Specification
Included CIPs
- CIP-29: Decrease inflation and disinflation
- CIP-30: Disable auto-claim of staking rewards
- CIP-31: Incorporate staking rewards into vesting account schedules
- CIP-32: Add Hyperlane to Celestia
All of the above CIPs are state breaking, and thus require a breaking network upgrade.
Rationale
This CIP provides a complete list of breaking changes for the Lotus upgrade, along with links to those specs.
Security Considerations
This CIP does not have additional security concerns beyond what is already discussed in each of the listed specs.
Copyright
Copyright and related rights waived via CC0.